<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Paul J. Ford and Company &#187; Hospitality</title>
	<atom:link href="http://pjfweb.com/category/buildings/hospitality/feed/" rel="self" type="application/rss+xml" />
	<link>http://pjfweb.com</link>
	<description>Structural Engineers</description>
	<lastBuildDate>Fri, 20 Aug 2010 16:42:42 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.4</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Westgate Resort &#8211; Myrtle Beach, South Carolina</title>
		<link>http://pjfweb.com/westgate-resort-myrtle-beach-south-carolina/</link>
		<comments>http://pjfweb.com/westgate-resort-myrtle-beach-south-carolina/#comments</comments>
		<pubDate>Tue, 21 Jul 2009 14:32:19 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Buildings]]></category>
		<category><![CDATA[Featured Projects]]></category>
		<category><![CDATA[Hospitality]]></category>

		<guid isPermaLink="false">http://pjfweb.com/?p=352</guid>
		<description><![CDATA[A mixed use timeshare resort consisting of 687 units in 3 towers: 16, 24, &#38; 27 stories  with a total of 1,479,000 gross square feet.  The project is located along the Atlantic coast of South Carolina within a high seismic zone, high wind zone and the coastal construction zone.
The structural system for the towers is post-tensioned cast-in-place [...]]]></description>
			<content:encoded><![CDATA[<p>A mixed use timeshare resort consisting of 687 units in 3 towers: 16, 24, &amp; 27 stories  with a total of 1,479,000 gross square feet.  The project is located along the Atlantic coast of South Carolina within a high seismic zone, high wind zone and the coastal construction zone.</p>
<p>The structural system for the towers is post-tensioned cast-in-place concrete flat plate slabs with shear walls to resist lateral forces.  The buildings are supported on driven piles designed to accommodate liquifiable soil conditions that may occur during a seismic event.  The Central Tower includes a ground floor check-in level with retail and restaurant space, nine levels of structured parking with a roof top amenity deck.  The amenity deck includes a swimming pool, hot tubs and cabanas.  From the west side of the amenity deck, the 17-story residential tower rises to complete the tower. Construction of the North Tower s complete.  The Central Tower is anticipatedto be complete in 2010 and the South Tower will start construction in accordance with market demands.  </p>

<a href='http://pjfweb.com/westgate-resort-myrtle-beach-south-carolina/beachside-viewwestgate-mb/' title='beachside-viewwestgate-mb'><img width="150" height="150" src="http://pjfweb.com/wp-content/uploads/2009/07/beachside-viewwestgate-mb-150x150.jpg" class="attachment-thumbnail" alt="" title="beachside-viewwestgate-mb" /></a>
<a href='http://pjfweb.com/westgate-resort-myrtle-beach-south-carolina/img_0869/' title='img_0869'><img width="150" height="150" src="http://pjfweb.com/wp-content/uploads/2009/07/img_0869-150x150.jpg" class="attachment-thumbnail" alt="" title="img_0869" /></a>
<a href='http://pjfweb.com/westgate-resort-myrtle-beach-south-carolina/img_0889/' title='img_0889'><img width="150" height="150" src="http://pjfweb.com/wp-content/uploads/2009/07/img_0889-150x150.jpg" class="attachment-thumbnail" alt="" title="img_0889" /></a>

<p><em>Project Team:</em></p>
<p> <em>    Architect:</em> Morris Architects</p>
<p>     <em>Owner:</em>Westgate Resorts</p>
]]></content:encoded>
			<wfw:commentRss>http://pjfweb.com/westgate-resort-myrtle-beach-south-carolina/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
